ISSN:
0009-286X
Keywords:
Chemistry
;
Polymer and Materials Science
Source:
Wiley InterScience Backfile Collection 1832-2000
Topics:
Chemistry and Pharmacology
,
Process Engineering, Biotechnology, Nutrition Technology
Notes:
Construction of chemical plant - preparation and execution. The construction of chemical production plant must be carried out observing all factors necessary for reliability. Furthermore, it should be performed as rapidly as possible to minimize erection costs and to ensure that the plant comes on stream by the desired date. To meet these demands, large construction projects require careful preparation such as model construction, production of isometric drawings, estimates of material and labour requirements just as much as good organization of the construction site. Chemical companies with engineering departments mainly constructing plant for their own requirements and which, unlike engineering companies, do not have to pay attention to the individual wishes of their customers, are usually able to work more uniformly and effectively, and with less expenditure on coordination.
Additional Material:
14 Ill.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1002/cite.330500105
Permalink