ISSN:
1089-7623
Source:
AIP Digital Archive
Topics:
Physics
,
Electrical Engineering, Measurement and Control Technology
Notes:
We are approximately half-way through the construction phase of the superconducting booster linac. Contracts have been placed for all major items, and many of these have been delivered. The high-beta resonator development has been successful and we are going ahead with construction of these.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1063/1.1138855
Permalink