Library

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Electronic Resource
    Electronic Resource
    Springer
    Water, air & soil pollution 94 (1997), S. 297-306 
    ISSN: 1573-2932
    Keywords: Beryllium ; solid waste ; red mud leachability ; immobilisation
    Source: Springer Online Journal Archives 1860-2000
    Topics: Energy, Environment Protection, Nuclear Power Engineering
    Notes: Abstract In view of the toxic nature of Beryllium and its compounds the disposal of waste materials containing beryllium needs prior evaluation. The present study was undertaken to obtain information on the leachability and immobilisation of beryllium from solid waste red-mud generated in processing Beryl at the Beryllium Metal Plant at Vashi, New Bombay. The studies showed that 62% of the total beryllium in red-mud can be extracted by water by repeated leaching over a period of 445 d. The mixing of the waste material with cement and casting into cement blocks reduced the leachability of beryllium to 0.11% which got further reduced to 0.02% by thermal curing of cement blocks.
    Type of Medium: Electronic Resource
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
  • 2
    Electronic Resource
    Electronic Resource
    Springer
    Water, air & soil pollution 94 (1997), S. 297-306 
    ISSN: 1573-2932
    Keywords: Beryllium ; solid waste ; red mud leachability ; immobilisation
    Source: Springer Online Journal Archives 1860-2000
    Topics: Energy, Environment Protection, Nuclear Power Engineering
    Notes: Abstract In view of the toxic nature of Beryllium and its compounds the disposal of waste materials containing beryllium needs prior evaluation. The present study was undertaken to obtain information on the leachability and immobilisation of beryllium from solid waste red-mud generated in processing Beryl at the Beryllium Metal Plant at Vashi, New Bombay. The studies showed that 62% of the total beryllium in red-mud can be extracted by water by repeated leaching over a period of 445 d. The mixing of the waste material with cement and casting into cement blocks reduced the leachability of beryllium to 0.11 % which got further reduced to 0.02% by thermal curing of cement blocks.
    Type of Medium: Electronic Resource
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...