The Florida State University post accelerator — Progress report

https://doi.org/10.1016/0167-5087(84)90434-4Get rights and content

Abstract

The construction of the cryogenic linac post accelerator for the FSU tandem is proceeding well. Phase 1 and phase 2 are nearing completion and funding is expected this year to enable us to proceed into phase 3. Development of the tandem in preparation for the linac and the present state of the linac installation are described. A lithium polarized source is being built and the present state of this project is also given.

References (7)

  • K.R. Chapman

    Nucl. Instr. and Meth.

    (1981)
  • P. Ashbaugh
  • E. Steffens

    Nucl. Instr. and Meth.

    (1977)
There are more references available in the full text version of this article.

Cited by (2)

  • The Florida State University post accelerator progress report

    1986, Nuclear Inst. and Methods in Physics Research, A
  • Status report on the Florida State linac project

    1986, Review of Scientific Instruments

Research supported in part by the National Science Foundation.

View full text