Library

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Electronic Resource
    Electronic Resource
    Springer
    IIE transactions 29 (1997), S. 391-398 
    ISSN: 1573-9724
    Source: Springer Online Journal Archives 1860-2000
    Topics: Mechanical Engineering, Materials Science, Production Engineering, Mining and Metallurgy, Traffic Engineering, Precision Mechanics
    Notes: Abstract We present a large-scale production scheduling problem where each order is unique and the processing time for an operation can be close to the size of a time period. Because modeling the problem as a multiprocessor flowshop results in a computationally intractable formulation, we cast the problem in production planning terms and extract a production schedule from the solution. To solve our model, we introduce the notion of ’almost continuous time' and show how to obtain good solutions to large problems efficiently.
    Type of Medium: Electronic Resource
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...