Library

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Electronic Resource
    Electronic Resource
    [S.l.] : American Institute of Physics (AIP)
    Review of Scientific Instruments 66 (1995), S. 2703-2707 
    ISSN: 1089-7623
    Source: AIP Digital Archive
    Topics: Physics , Electrical Engineering, Measurement and Control Technology
    Notes: A mock-up has been constructed to test the functioning and performance of the Advanced Photon Source (APS) front ends. The mock-up consists of all components of the APS insertion-device beamline front end with a differential pumping system. Primary vacuum tests have been performed and compared with finite element vacuum calculations. Pressure distribution measurements using controlled leaks demonstrate a better than four decades of pressure difference between the two ends of the mock-up. The measured pressure profiles are consistent with results of finite element analyses of the system. The safety-control systems are also being tested. A closing time of ∼20 ms for the photon shutter and ∼7 ms for the fast closing valve have been obtained. Experiments on vacuum protection systems indicate that the front end is well protected in case of a vacuum breach. © 1995 American Institute of Physics.
    Type of Medium: Electronic Resource
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...