Library

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    ISSN: 1089-7623
    Source: AIP Digital Archive
    Topics: Physics , Electrical Engineering, Measurement and Control Technology
    Notes: At Lawrence Berkeley Laboratory's Advanced Light Source, three 4.6 m long undulators have been completed, tested, and installed. A fourth is under construction. The completed undulators include two 5.0 cm period length, 89 period devices (U5.0s) which achieve a 0.85 T effective field at a 14 mm minimum gap and a 8.0 cm period length, 55 period device (U8.0) that reaches a 1.2 T effective field at a 14 mm minimum gap. The undulator under construction is a 10.0 cm period length, 43 period device (U10.0) that is designed to achieve 0.98 T at a 23 mm gap. Undulator magnetic gap variation (rms) is within 25 μm over the periodic structure length. Reproducibility of the adjustable magnetic gap has been measured to be within ±5 μm. Gap adjusting range is from 14 to 210 mm, which can be scanned in 1 min. The 5.1 m long vacuum chambers are flat in the vertical direction to within 0.74 mm and straight in the horizontal direction to within 0.08 mm over the 4.6 m magnetic structure sections. Vacuum chamber base pressures after UHV beam conditioning are in the mid-10−11 Torr range and storage ring operating pressures with full current are in the low 10−10 Torr range. Measurements show that the uncorrelated magnetic field errors are 0.23% and 0.20% for the two U5.0s and the U8.0, respectively, and that the field integrals are small over the 1 cm×6 cm beam aperture. Device description, fabrication, and measurements are presented. © 1995 American Institute of Physics.
    Type of Medium: Electronic Resource
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...