Library

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
Filter
  • 1990-1994  (2)
  • 1992  (2)
  • Biochemistry and Biotechnology  (1)
  • Hopfield neural network  (1)
  • 1
    Electronic Resource
    Electronic Resource
    Springer
    Journal of intelligent manufacturing 3 (1992), S. 251-261 
    ISSN: 1572-8145
    Keywords: Assembly sequences ; constrained TSP ; Hopfield neural network
    Source: Springer Online Journal Archives 1860-2000
    Topics: Mechanical Engineering, Materials Science, Production Engineering, Mining and Metallurgy, Traffic Engineering, Precision Mechanics
    Notes: Abstract The problem of finding an AND/OR precedence-constraint assembly schedule using optimization neural computation is presented. The precedence relationships of assembly operation result from the geometric constraints of subtasks. Because of the existence of geometric constraints among assembly subtasks, the assembly operation involves AND/OR precedence relationships; that is, the order of assembly crucially determines whether the desired task can be achieved. A feasible assembly schedule is a schedule that satisfies these AND/OR precedence constraints. It has been shown that all the feasible assembly schedules can be generated by transforming geometric constraints of subtasks to the pattern-matching operation. Using the question-answer pattern and pattern-matching operation, the assembly scheduling problem can be transformed into an AND/OR precedence-constrained traveling salesman problem (TSP). Two precedence-constrained TSPs, cost-constrained TSP (CCTSP) and state-constrained TSP (SCTSP), are discussed. The CCTSP artificially sets the cost of the prohibited moves to a very large value which ensures that the constraints are satisfied, while the SCTSP restricts the movement of next assembly subtasks. The advantage of the SCTSP over CCTSP in the generation of the assembly schedule will be illustrated. A novel method proposed here is to obtain the best AND/OR precedence-constraint assembly schedule using neural network computation. The geometric constraints of an assembled object are transformed into the elements of the connection matrix which specifies the connection strength among neurons. A modified Hopfield network is used to tackle the AND/OR precedence-constraints assembly scheduling problem. Multirobot assembly sequences generation is also discussed. The designed algorithm can accommodate various constraints and applications. Detailed algorithms, examples and experiments are presented.
    Type of Medium: Electronic Resource
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
  • 2
    Electronic Resource
    Electronic Resource
    New York, NY [u.a.] : Wiley-Blackwell
    Biotechnology and Bioengineering 40 (1992), S. 446-449 
    ISSN: 0006-3592
    Keywords: urea sensor ; plasma reaction ; poly(propylene) membrane ; Chemistry ; Biochemistry and Biotechnology
    Source: Wiley InterScience Backfile Collection 1832-2000
    Topics: Biology , Process Engineering, Biotechnology, Nutrition Technology
    Notes: Urease was immobilized on the plasma-aminated surface of a hyfrophobic poly(propylene) (PP) membrane. This membrane, with urease matrix on one side while maintaining its original hydrophobic property on the other, was used to construct the urea sensor. The new urea sensors had response sensitivities ranged from 19 mV/decade to 30 mV/decade depending on the conditions of the plasma reaction. The enzyme electrode using single membrane gave a shorter response time as compared to the corresponding conventional electrode employing two seperate PP membranes. The sensitivity of the enzyme electrode increased with increasing buffer pH and reached a maximal level (40 mV/decade) at pH 7.6. The response sensitivity of the electrode was not affected by the change of buffer strength. Deamination of the plasma-modified hydrophobic PP membrane did not occur in aqueous environment judging from the stability of the urea electrode up to 12 days of operation. © 1992 John Wiley & Sons. Inc.
    Additional Material: 4 Ill.
    Type of Medium: Electronic Resource
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...