Bibliothek

feed icon rss

Ihre E-Mail wurde erfolgreich gesendet. Bitte prüfen Sie Ihren Maileingang.

Leider ist ein Fehler beim E-Mail-Versand aufgetreten. Bitte versuchen Sie es erneut.

Vorgang fortführen?

Exportieren
  • 1
    Digitale Medien
    Digitale Medien
    Springer
    Annals of operations research 100 (2000), S. 251-272 
    ISSN: 1572-9338
    Schlagwort(e): multistage stochastic programming ; mixed-integer ; Lagrangian relaxation ; power management ; stochastic unit commitment
    Quelle: Springer Online Journal Archives 1860-2000
    Thema: Mathematik , Wirtschaftswissenschaften
    Notizen: Abstract A dynamic (multi-stage) stochastic programming model for the weekly cost-optimal generation of electric power in a hydro-thermal generation system under uncertain demand (or load) is developed. The model involves a large number of mixed-integer (stochastic) decision variables and constraints linking time periods and operating power units. A stochastic Lagrangian relaxation scheme is designed by assigning (stochastic) multipliers to all constraints coupling power units. It is assumed that the stochastic load process is given (or approximated) by a finite number of realizations (scenarios) in scenario tree form. Solving the dual by a bundle subgradient method leads to a successive decomposition into stochastic single (thermal or hydro) unit subproblems. The stochastic thermal and hydro subproblems are solved by a stochastic dynamic programming technique and by a specific descent algorithm, respectively. A Lagrangian heuristics that provides approximate solutions for the first stage (primal) decisions starting from the optimal (stochastic) multipliers is developed. Numerical results are presented for realistic data from a German power utility and for numbers of scenarios ranging from 5 to 100 and a time horizon of 168 hours. The sizes of the corresponding optimization problems go up to 200 000 binary and 350 000 continuous variables, and more than 500 000 constraints.
    Materialart: Digitale Medien
    Bibliothek Standort Signatur Band/Heft/Jahr Verfügbarkeit
    BibTip Andere fanden auch interessant ...
  • 2
    Publikationsdatum: 2014-02-26
    Beschreibung: The paper addresses the unit commitment problem in power plant operation planning. For a real power system comprising coal and gas fired thermal as well as pumped storage hydro plants a large-scale mixed integer optimization model for unit commitment is developed. Then primal and dual approaches to solving the optimization problem are presented and results of test runs are reported.
    Schlagwort(e): ddc:000
    Sprache: Deutsch
    Materialart: reportzib , doc-type:preprint
    Format: application/postscript
    Format: application/pdf
    Bibliothek Standort Signatur Band/Heft/Jahr Verfügbarkeit
    BibTip Andere fanden auch interessant ...
Schließen ⊗
Diese Webseite nutzt Cookies und das Analyse-Tool Matomo. Weitere Informationen finden Sie hier...