    [S.l.] : American Institute of Physics (AIP)
    Review of Scientific Instruments 67 (1996), S. 3374-3374 
    ISSN: 1089-7623
    Source: AIP Digital Archive
    Topics: Physics , Electrical Engineering, Measurement and Control Technology
    Notes: Fifteen out of forty initial beamline front ends have been installed in the storage-ring tunnel at the 7-GeV Advanced Photon Source (APS). For the front-end installation, a four-step alignment process was designed and consists of (1) prealigning the front-end components with support tables in the preassembly area, (2) installing the components with tables in the storage-ring tunnel and aligning relative to the APS global telescope survey network, (3) confirming the alignment using a tooling laser alignment system, and (4) performing adjustments with the synchrotron-radiation beam during commissioning. The laser alignment system and the prealignment database have been of great importance for the expedient maintenance of front-end components. These tools are very important to a large synchrotron radiation facility, such as the APS, since they make a quick alignment setup possible and minimize alignment time inside the tunnel. This paper will present the four-step alignment process, the laser alignment system, and discuss the alignment confirmation results. © 1996 American Institute of Physics.
    Type of Medium: Electronic Resource
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...