ISSN:
1089-7623
Source:
AIP Digital Archive
Topics:
Physics
,
Electrical Engineering, Measurement and Control Technology
Notes:
Fifteen out of forty initial beamline front ends have been installed in the storage-ring tunnel at the 7-GeV Advanced Photon Source (APS). For the front-end installation, a four-step alignment process was designed and consists of (1) prealigning the front-end components with support tables in the preassembly area, (2) installing the components with tables in the storage-ring tunnel and aligning relative to the APS global telescope survey network, (3) confirming the alignment using a tooling laser alignment system, and (4) performing adjustments with the synchrotron-radiation beam during commissioning. The laser alignment system and the prealignment database have been of great importance for the expedient maintenance of front-end components. These tools are very important to a large synchrotron radiation facility, such as the APS, since they make a quick alignment setup possible and minimize alignment time inside the tunnel. This paper will present the four-step alignment process, the laser alignment system, and discuss the alignment confirmation results. © 1996 American Institute of Physics.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1063/1.1147344
Permalink