ISSN:
1600-5775
Source:
Crystallography Journals Online : IUCR Backfile Archive 1948-2001
Topics:
Geosciences
,
Physics
Notes:
Before the commissioning of SPring-8, the in-vacuum hybrid undulator developed at SPring-8 had been brought to the ESRF for the first beam test in the summer of 1996. The purpose of this test was to investigate the influence of the in-vacuum undulator on the beam and check its vacuum system. However, heating by the resistive wall impedance turned out to be a critical issue for the in-vacuum undulators.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1107/S0909049597014325