ISSN:
1089-7623
Source:
AIP Digital Archive
Topics:
Physics
,
Electrical Engineering, Measurement and Control Technology
Notes:
The status of the development of insertion devices for the 1.5–2-GeV synchrotron radiation source ELETTRA is described. Recent results achieved with a prototype pure permanent magnet undulator and the construction and performance of a prototype hybrid multipole wiggler are presented. The parameters and design of the first undulator that will be constructed for ELETTRA, U12.5, are also presented, and some details are given about the magnetic measurement system.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1063/1.1142765